Hi,
After copying a pipeline in the same model, there are 2 pipelines with the same number, I want to change the line number of one of the 2 pipes.
Best Regards,
Salim
Hi,
After copying a pipeline in the same model, there are 2 pipelines with the same number, I want to change the line number of one of the 2 pipes.
Best Regards,
Salim