Hi,
In OPM, how would one go about setting the levels of placed pipe and components? Can I have all pipes placed on a single preset level, all valves on another level, all flanges on yet another level etc.
If that's not possible, can the new level name be customised? Out of the box, OPM seems to create a new level based on the active pipeline number when a pipe segment is placed.
Best regards,
Tuan